August 24, 2016 - Engineering intern Jeffry Faulkner navigates the Campus Renewal construction site easily en route to his 10
th floor destination. Weaving through the floor framed rooms, he stops at an east facing window in a future patient room. Outside the window, a makeshift sprinkler is spraying water at the window and framing. He looks for leaks.
February 22, 2016 - Ramona Tumblin-Rucker and Henry Woods are working to build a better community by inspiring young people to succeed.