Move dates:
- September 23 - administration
- Sept. 23-Oct. 4 - operations (maintaining in both buildings)
Current location: Second floor, in the building adjacent to receiving is administration and the shop area.
New location: Ground floor
See floor plan
The facilities engineering department is modernized and gains many efficiencies, with adjacent spaces serving numerous functions: administration, engineering shop, engineering locker room and house-wide stock room for ceiling tiles, paint and similar supplies. Certain areas are badge accessible.
Hours: 24/7 with facilities engineering staff on site
Phone number:
Department champion: Tim Knabe [email protected]